Every land deal,
with everyone already at the table.
A
Adam
Owns the land
Hundreds of texts and emails.
Hunting for the right buyer.
Can this buyer actually close?
Sending the same Dropbox link 1,000 times.
Wanting top dollar, but needing to move the dirt quick.
B
Bob
Builder
Dozens of brokers sending the same deals.
Making assumptions on cost and timelines.
Underwriting that's hopefully “good enough.”
Gathering bids from dozens of places: text, email, software.
S
Sam
Excavation
Tracking plans through email chains and text threads.
Losing bids for lack of information.
Wanting organization, structure, predictability.
Wanting jobs, spending too much on marketing.
Same deal,
living in 10 different places.
Lack of information and disorganization lead to slow deals and frustrating experiences.
In a
perfect
world,
deals come to ready builders with engaged subs.
A
Adam
B
Bob
S
Excavation
S
Framing
S
Concrete
S
Plumbing
S
Electrical
S
Roofing
Everyone is
already at the table.
Spark is the
brain
of FlintOS.
It learns about you and your buy box, and ensures a deal never misses you.
Adam's 18 lots.
Bob's buy box.
Adam sees Bob. Never Bob's team, bids or numbers.
Spark
A
Adam
18 lots · Hurricane
B
Bob
½-acre lots, up to 20
S
Sam · Excavation
F
Framing
K
Civil engineer
R
Lender
Every file, bid and message in one place, on everyone's phone.
A
Adam
Owns the land
9:41
A
Listings
New listing · Land
Cedar Ridge
Lots
18 × 0.5 acre
Stage
Papered
Price
$95,000 / lot
Location
Hurricane, UT
Who sees it
By role
By name
Builders & Developers
Home Builders
Chairmen
Deal files
Plat map.pdf
Open
Geotech report.pdf
After NDA
Title commitment.pdf
After NDA
Utility will-serve.pdf
After NDA
Save and turn Spark on
A
Listings
Land · War Room
Cedar Ridge
18 × 0.5 acre · Hurricane, UT
Deals
Spark is matching builders
B
Bob
Builder · ½-acre lots, up to 20
Engaged
NDA signed
LOI in
Bob's team, bids and numbers stay with Bob.
Home
OS
Collective
Assistant
A
Cedar Ridge
Bob · Deal Room
NDA signed by both · names open
Bob
Walked it Saturday. Pulling numbers with my team now.
Bob
Here's our offer. 18 lots at $90k, 60 days due diligence.
LOI · Cedar Ridge.pdf
You
Close. Make it 45 days due diligence and it's a deal.
Bob
Done. 45 days. Send the REPC.
You
Signed on my end.
REPC · Cedar Ridge.pdf
Signed · Adam
Bob
Fully executed.
REPC · Cedar Ridge.pdf
Executed
Under contract · Cedar Ridge
Message
B
Bob
Builder
9:41
B
Deals
Me
Listings
Subcontractors
Board
Spark · Match for you
Cedar Ridge
18 × 0.5 acre · Hurricane, UT · fits Aspen Meadows
Land
Aspen Meadows
½-acre lots · up to 20 · St George area
1 match
Land
The Villas
Finished lots · Washington County
Home
OS
Collective
Assistant
B
Aspen Meadows · Land
18 lots · Hurricane, UT
Spark
Matched on: Land · ½-acre lots · 18 of your 20 · price · Hurricane, 18 mi from St George
The Listing
Lots
18
Lot size
0.5 ac
Stage
Papered
Price
$95,000 / lot
Location
Hurricane, UT
Deal files
Plat map.pdf
Open
3 more after the NDA
Engage
Pass
Non-disclosure · Cedar Ridge
What Adam shares stays between you and the team you bring in.
No going around Adam or his broker.
Your team signs the same terms before they see it.
Sign
B
Aspen Meadows · Land
War Room
Cedar Ridge
Files
Team
Numbers
Schedule
Deal files · from Adam
Plat map.pdf
Geotech report.pdf
Title commitment.pdf
Utility will-serve.pdf
Bob's files · only you
Site budget.xlsx
Product plans · 2,400 sf.pdf
Engage Others
Bids on Cedar Ridge
Excavation
Waiting on bids
S
Sam
$412,000
D
Desert Dirtworks
$438,000
Framing
Waiting on bids
R
Ridgeline Framing
$1,260,000
Concrete
Waiting on bids
C
Canyon Concrete
$486,000
Engineering
Waiting on bids
K
Kade Engineering
$64,000
Drywall
Waiting on bids
S
Summit Drywall
$342,000
Lender
Waiting on terms
R
Red Rock Bank
65% LTC
Underwriting · 18 homes
Land · 18 × $90,000
$1,620,000
Site work
from Sam's bid
$412,000
Engineering
from Kade's bid
$64,000
Vertical · 18 × $340,000
$6,120,000
Financing
Red Rock term sheet · 65% LTC
$420,000
Total cost
$8,636,000
Sales · 18 × $585,000
$10,530,000
Margin
18.0%
Schedule · Cedar Ridge
May
Jun
Jul
Aug
Sep
Oct
Engineering
Excavation · Sam
Utilities
Foundations
Framing
Sam: rain, Excavation +1 week
Push timelines back 1 week?
Push 1 week
Not now
Pushed 1 week · the team sees the new dates
Home
OS
Collective
Assistant
Engage Others
They sign the same NDA and see the files you pick.
Excavation
Sam, Desert Dirtworks
Framing
Ridgeline Framing
Concrete
Canyon Concrete
Engineering
Kade Engineering
Drywall
Summit Drywall
Lender
Red Rock Bank
Send to 7
B
Cedar Ridge · Team
Sam · Excavation
Award bid
Sam
Geotech shows rock at 4 ft. My number includes blasting.
Sam
Here's the bid.
Excavation bid.pdf
$412,000
Spark saved it to this room's files
You
Can you hold that through June?
Sam
Yes. Good through June 30.
Awarded to Sam · $412,000
You
Let's go to work!
Message
Award Excavation to Sam?
$412,000 · Excavation bid.pdf. The others in this trade hear it went another way.
Award
B
Cedar Ridge
Adam · Deal Room
NDA signed by both · names open
You
Walked it Saturday. Pulling numbers with my team now.
You
Here's our offer. 18 lots at $90k, 60 days due diligence.
LOI · Cedar Ridge.pdf
Adam
Close. Make it 45 days due diligence and it's a deal.
You
Done. 45 days. Send the REPC.
Adam
Signed on my end.
REPC · Cedar Ridge.pdf
Signed · Adam
You
Fully executed.
REPC · Cedar Ridge.pdf
Executed
Under contract · Cedar Ridge
Message
REPC · Cedar Ridge.pdf
Done
REPC
X
S
Sam
Excavation
9:41
S
Deals
Board
Bid request · Excavation
Cedar Ridge · 18 lots
From Bob · due May 30
New
Bid · Excavation
Desert Bloom pad sites
From Bob ·
Awarded
Home
OS
Collective
Assistant
S
Board
Bid request · Excavation
Cedar Ridge · 18 lots
From Bob · Hurricane, UT · due May 30
Files Bob shared
Plat map.pdf
Geotech report.pdf
Product plans · 2,400 sf.pdf
Open the room with Bob
Non-disclosure · Bob
What Bob shares stays with you.
Your bid is sealed. Only Bob sees it.
Sign
S
Cedar Ridge
Bob · Deal Room
You
Geotech shows rock at 4 ft. My number includes blasting.
You
Here's the bid.
Excavation bid.pdf
$412,000
Spark saved it to this room's files
Bob
Can you hold that through June?
You
Yes. Good through June 30.
You won the bid · $412,000
Bob
Let's go to work!
On the schedule
Excavation · Jun 2 to Jul 11
You
The rain delayed me by a week.
Message
A
B
S
The land, the builder
and the trades.
One room.
FLINT-OS.COM/BUILD
❚❚
0:00